Development timeline

Development timeline

Changes

  • Extended import utilities because that's ongoing while we're loading data
  • Extended Load data (and Reload data) to overlap with Validation utilities because some validation may be done in the mapping process
    • Some invalid data violates database constraints and must be set to NULL on import. If a mapping later fixes the data, the data must be re-loaded to store these fields.
  • Extended Revise schemas II because that could continue as long as we're trying to fit new data into the schema
  • Extended Validation utilities to the endpoint of Data provider feedback because they are related, and to allow additional time for geovalidation and possibly georeferencing

Previous versions

See December 8 2011 WebEx meeting > BIEN3.0 development timeline