master script, temp predictions, for Oregon with 7 hold out prop, 10 samples and 12 dates
master script, multisampling first predictions with new code using prop hold out 10% to 70%
initial commit, analyses paper part 1 with revised results
master script, test run for NASA
master script, preparing data for Oregon for the test run
raster prediction, modification for screening of training, runs by stage
covariates production script, fixing bug without stage 2
gam day, predictions for paper testing covariates combination 4
kriging day, predictions for paper, testing covariates combination 3
gwr day predictions for paper, testing covariate combination 3, part 1
gam day predictions for paper testing covariates combination 3
gam day testing covariates combination for paper OR
gam day with additional screening of training data for model comparison paper OR
gam day additional screening for model comparison, paper OR
gam day, testing covariates combination with nesting and ti() for paper Oregon
gam fusion handling errors
covariates preparation, dealing with projection shift and keeping track of covariates names after screening
gam day with screening of values, OR analyses for paper
testing screening using GAM predictions in Oregon
covariates, fixing screening function to remove extreme values
adding function to define projection system
covariates production function, adding screening for extreme values
master script adding arguments to screen covariates
results output script, modifications to output graphs for added methods: gam_daily, gwr_daily, kriging_daily
data preparation, modifications to run anywhere, Queensland test
master script, testing code for Queensland region using Gam fusion
adding GWR daily method, modifications in interpolation day function script
LST calculation for Queensland region
adding GWR daily method, test in Oregon
running GAM CAI with monthly stations averages for 2000-2010 time period
slight modifications, solving issues for covariate brick production
raster prediction function, modifications related to kriging daily method
raster prediction function, modifications related to gam daily method
interpolation day script, adding kriging daily method prediction
interpolation day script, adding GAM daily prediciction method
LST climatology, changes to output location and adding compression to tif output
testing workflow for Oregon, fixing problems related to automation for covariates production
master script, debugging covariates production for Oregon study area
downloading North America tiles, continued
LST clim averages calc,testing parallel call to python scripts
covariates production script, major changes to automate the process, added also distance to coast product
master script, covariates production automation first changes
downloading of North America tiles, continued...
covariates production, modification related to output and parallelization to speed up
master script, gam fusion using tensor as basis e.g. te(x,y)
master script, gam fusion additional models using s(x,y), s(x,y,LST)
gam fusion prediction, minor output path changes following debugging
data preparation, debugging, clean up of input parameters names
LST script calc, modifications to allow parallel call of python+GRASS script
download and LST calc, modification of output and downloading of South America tiles
covariates preparation script, modifications to handle LST inputs and output directory
LST processing function, test and modifications
LST processing R function, initial commit, calls to python scripts
master script, calling python scripts from R function
master script, adding call to python scripts
initial commit, script for grass set to access python in R
handling modis dowloading outputs
splitting LST climatology script - downloading of modis tiles
splitting LST script-climatology calculation
LST downloading and climatology python script passing arguments from shell
results ouput analyses, modifications outputs and clean up
validation script, modifications to store results in output folder and additional minor changes
raster prediction, modifications log file and output tracking for workflow run
gam fusion, gam CAI functions modifications to store predictions in one unique output folder
data preparation script, modifications to store outputs in one unique output folder
master script modifications regarding outputs and clean up
validation script function for monthly averages for accuracy metrics
results analyses, modifications to allow for gam cai and other methods
validation first modification to add monthly averages for accuracy metrics
gam cai funciton test run
master script gam CAI predictions run and modifications
GAM CAI added to script and modification of function for daily deviation
raster prediction function, modifications to make code general for any interpolation method
master script adding GAM CAI method and parameters for Venezuela region
output resuults analyses, modifications to reflect general name of objects from earlier scripts
modifications script for figures AAG conference and screening of LST
initial commit combined boxplots for later use
code for figure paper and conference:land cover elevation difference,spatial transects
IBS figures code re-use
IBS conference, code used to create figures initial commit
raster prediction, additional modifications following run for Oregon TMAX interpolation
gam fusion function remove change of name for elevation covariate
master script run first test for Oregon interpolation TMAX using covar stack
data preparation, addtional modifications to allow for Oregon and any regions
AAG 2013 figures, covariates stack, screening and modification to allow continuity for Oregon TMAX
initial commit AAG2013 and transition script for continuity of results from Oregon using previous covariates brick
gam fusion function modifications to allow any variable (TMIN) and record results
results output figures modifications to allow TMIN output figures
run TMIN predictions year 2000 Venezuela
results stations and covar outputs modifications
run Venezuela prediction TMAX year 2010 with monthly averages 2000-2011
run prediction follwing modifications for year 2010 Venezuela with monthly 1981-2010 averages
raster prediction and gam fusion modifications for TMIN predictions
master script, running first test for TMIN predictions Venezuela
data preparation following up modifications related to flags and output from functions
Data preparation, degugging query year period and adding other improvements to keep track of datasets used in interpolation
run TMAX prediction Venezuela year 2000 with monthly averages from 2000-2010 time period
run TMAX prediction Venezuela for year 2000 with 1981-2010 period and modifications in sourcing and input parameters
Validation functions, degugging, missing parameters and library
Raster prediction, modifications to solve issues with calls and multiple sourcing