Project

General

Profile

Statistics
| Revision:
  • svn:ignore: .~*

# Date Author Comment
12947 03/27/2014 10:41 AM Aaron Marcuse-Kubitza

planning/workflow/bien3_architecture/stage_I.png, stages.png: synced to bien3_architecture.pptx

12946 03/27/2014 10:32 AM Aaron Marcuse-Kubitza

planning/workflow/bien3_architecture.pptx: stage I: clarified that the database input is intended to be a normalized input, and its corresonding output is intended to be denormalized

12613 03/06/2014 11:30 AM Aaron Marcuse-Kubitza

planning/meetings/BIEN conference call availability.xlsx: updated

12020 02/02/2014 01:57 AM Aaron Marcuse-Kubitza

planning/resources/dev_machine.specs/sys_info.spx+/system_power_settings.txt: updated: enabled "Automatic Restart on Power Loss" and "Wake on LAN" for UPS (this requires using pmset, as described at http://vegpath.org/links/#pmset%281%29%20Mac%20OS%20X%20Manual%20Page )

11986 01/21/2014 07:33 PM Aaron Marcuse-Kubitza

planning/resources/dev_machine.specs/sys_info.spx+/system_power_settings.txt: updated: enabled PrioritizeNetworkReachabilityOverSleep

11984 01/21/2014 07:22 PM Aaron Marcuse-Kubitza

added planning/resources/dev_machine.specs/

11970 01/20/2014 11:33 AM Aaron Marcuse-Kubitza

moved everything into /trunk/ to create the standard svn layout, for use with tools that require this (eg. git-svn). IMPORTANT: do NOT do an `svn up`. instead, re-use your working copy's existing files with `svn switch` (http://svnbook.red-bean.com/en/1.6/svn.ref.svn.c.switch.html).

11941 01/09/2014 01:38 AM Aaron Marcuse-Kubitza

planning/meetings/BIEN conference call availability.xlsx: updated

11939 12/20/2013 10:45 PM Aaron Marcuse-Kubitza

fix: planning/timeline/timeline.xls: realigned legend

11938 12/20/2013 10:44 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.xls: hid previous weeks

11937 12/20/2013 10:43 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.xls: crossed out and hid completed tasks

11936 12/20/2013 10:41 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.xls: updated for progress

11926 12/20/2013 01:18 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.xls: updated for progress

11925 12/20/2013 01:13 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: renamed to timeline.xls so that this can continue to be used for 2014 (leaving a symlink from the old filename to preserve permalinks)

11909 12/12/2013 08:57 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11894 12/10/2013 07:44 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: rescheduled tasks

11893 12/10/2013 07:40 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11891 12/10/2013 07:32 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11890 12/10/2013 07:32 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: datasource validations: reordered datasources according to Brian Enquist's new validation order (wiki.vegpath.org/Spot-checking_validation_order)

11886 12/10/2013 05:18 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: hid previous weeks

11885 12/10/2013 05:18 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: added timespan dots ◦ for supertasks

11884 12/10/2013 05:15 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: legend: changed to movable text box to avoid needing to erase and repopulate the header columns with the legend cells

11883 12/10/2013 05:03 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: crossed out and hid completed tasks

11882 12/10/2013 04:58 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11791 11/27/2013 08:48 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11780 11/26/2013 07:38 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: rescheduled tasks

11779 11/26/2013 06:51 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: rescheduled tasks

11778 11/26/2013 06:41 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11767 11/26/2013 06:48 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: added timespan dots ◦ for supertasks

11766 11/26/2013 06:46 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: crossed out and hid completed tasks

11765 11/26/2013 06:20 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: hid previous weeks

11764 11/26/2013 06:18 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: consolidated legend to take up fewer columns and avoid repeating labels

11763 11/26/2013 06:09 AM Aaron Marcuse-Kubitza

bugfix: inputs/CVS/import_order.txt: added taxon_observation.**. rescheduled tasks.

11762 11/26/2013 06:05 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11750 11/25/2013 07:59 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11734 11/25/2013 12:26 AM Aaron Marcuse-Kubitza

added planning/publication/KNB/submission.published.old_site.maff, submission.published.eml.xml from old KNB site

11733 11/25/2013 12:18 AM Aaron Marcuse-Kubitza

added planning/publication/KNB/submission.*

11716 11/21/2013 11:52 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: removed the weeks of 12/23, 12/30 because these are during winter break. rescheduled tasks.

11714 11/21/2013 10:23 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: rescheduled tasks

11713 11/21/2013 10:16 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: crossed out and hid completed tasks

11712 11/21/2013 10:14 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11701 11/20/2013 01:21 PM Aaron Marcuse-Kubitza

added planning/legal/open-sourcing/request_to_open_source_software.orig.docx.url

11700 11/20/2013 01:18 PM Aaron Marcuse-Kubitza

added planning/legal/open-sourcing/, which will contain the "request to open source software" form (this cannot be under version control due to copyright limitations stated in the form)

11693 11/18/2013 06:52 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: hid previous weeks

11692 11/18/2013 06:51 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: rescheduled tasks

11691 11/18/2013 06:45 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: added timespan checkmarks

11690 11/18/2013 06:44 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: hid completed tasks

11689 11/18/2013 06:43 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11666 11/14/2013 01:00 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: added tasks "create high-level workflow diagram" and "load BIEN2 exports directly from raw data", as requested by Martha

11596 11/07/2013 04:41 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11594 11/07/2013 08:42 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11585 11/06/2013 11:22 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11572 11/05/2013 10:30 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11554 10/31/2013 12:29 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11553 10/31/2013 12:24 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: datasource validations: CVS: left-join it: moved under "fix issues and critical feature requests" instead of "prepare 1st-round extracts" because the left-joining is actually part of getting it in the same format as VegBank

11551 10/31/2013 10:30 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: datasource validations: rescheduled CVS before other datasources, as decided in the conference call

11549 10/31/2013 08:53 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: datasource validations: rescheduled tasks for new order

11548 10/31/2013 08:42 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: datasource validations: reordered to put plots before specimens, as requested by Brad (wiki.vegpath.org/2013-10-25_conference_call#validation-order)

11547 10/31/2013 08:24 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11546 10/31/2013 08:21 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: hid previous weeks

11545 10/31/2013 08:20 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: crossed out and hid completed tasks

11544 10/31/2013 08:17 AM Aaron Marcuse-Kubitza

fix: planning/timeline/timeline.2013.xls: datasource validations: prepare 2nd-round extracts: VegBank: corrected check mark week, based on date of extract

11543 10/31/2013 08:14 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: datasource validations: added "prepare 3rd-round extracts" subtask, which currently applies to VegBank. updated for progress.

11542 10/31/2013 08:08 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: "datasource validations (spot-checking)": renamed to just "datasource validations" because that's what we've been calling it

11541 10/31/2013 08:08 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: datasource validations: CVS: added "VegBank-related changes" subtask

11540 10/31/2013 08:05 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress and revised schedule

11508 10/30/2013 08:07 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: geoscrubbing automated pipeline: split into subtasks "build pipeline", "test pipeline", and "integrate pipeline into import process"

11507 10/30/2013 08:04 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: geoscrubbing re-run: moved recent checkmarks to "geoscrubbing automated pipeline" since the work on these actually relates to automating the geoscrubbing, not the one-time reload (which was already completed)

11506 10/30/2013 08:02 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: geoscrubbing: made "geoscrubbing re-run" a subtask of the main geoscrubbing task, instead of geoscrubbing re-run being the supertask. updated for Paul's progresss.

11486 10/30/2013 03:54 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11464 10/29/2013 08:19 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: add globally-unique occurrenceID: removed "globally-unique" because Naia is actually OK with this being numeric (i.e. unique within our DB)

11463 10/29/2013 08:19 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11458 10/29/2013 06:19 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11455 10/29/2013 02:22 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: usability testing: added additional subtask to validate the scientists' extracts (i.e. check that the extract fulfills their request)

11454 10/29/2013 02:17 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: provide scientists with their requested data: added separate subtask for Brian Enquist's Canadensys extract

11453 10/29/2013 02:12 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress and revised schedule

11441 10/25/2013 11:56 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: reload core & analytical database scheduled for this week: postponed to give us additional time to do datasource validations

11402 10/22/2013 06:38 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11398 10/22/2013 01:20 PM Aaron Marcuse-Kubitza

added planning/goals/web_interface/phpPgAdmin.select_interface.png for use at wiki.vegpath.org/Proposed_enhancements

11395 10/21/2013 05:16 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: usability testing: added subtask to provide scientists with their requested data

11394 10/20/2013 05:51 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: updated for progress

11344 10/18/2013 04:03 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: "geoscrubbing automated pipeline": scheduled for after Paul's current set of tasks on the geoscrubbing re-run is complete. i'm budgeting several weeks for this since my understanding is that Paul is doing this part-time.

11343 10/18/2013 03:57 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: moved "geoscrubbing automated pipeline" under "simplify import process for easier maintainability"

11342 10/18/2013 03:53 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: geoscrubbing re-run: added subtask to spot-check reloaded geoscrubbing data

11341 10/18/2013 03:52 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: geoscrubbing re-run: added separate subtask for "geoscrubbing data reload", since apparently it was not clear that of course the new data will need to be imported into VegBIEN before the results of the re-run are available. this is currently scheduled to happen in the next full-database import, which is the week of 10/28 in order to include further validations fixes.

11340 10/18/2013 02:06 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: CVS validation: use timespan dot ◦ for supertask

11339 10/18/2013 02:05 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: CVS validation: added subtasks that are similar to for FIA validation (create validation subset, create extract)

11338 10/18/2013 02:03 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: FIA validation: split apart into subtasks, including "decide which columns to validate", which has to happen ahead of time before the extract can be generated

11337 10/18/2013 01:15 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: fixed check marks for past (hidden) weeks, which had gotten duplicated when rows were copied together with their check marks

11336 10/18/2013 01:04 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: fixed line heights

11335 10/18/2013 12:57 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: fixed column width so the dates display properly in MS Excel

11334 10/18/2013 12:48 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: right-aligned legend so it isn't too close to the "During week of:" label

11333 10/18/2013 12:46 PM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: added legend:
• task
◦ timespan
✓ task progress
☑ timespan progress

11332 10/18/2013 10:25 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: attribution/conditions of use: made it a subtask of "add missing columns" because this is related to data needed for published analyses. added dots because this is an ongoing task, that depends on data providers getting their use conditions to us.

11331 10/18/2013 10:08 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: reload core & analytical database: moved next reload ahead to last week of October so that we can include the updated geovalidation data for the 10/31 deadline. added additional reload so that they are spaced <= 1 month apart.

11330 10/18/2013 09:54 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: receive feedback from documentation tester: added an extra week to receive additional feedback from them in response to documentation fixes made

11329 10/18/2013 09:51 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: attribution/conditions of use: made this a top-level task instead of a subtask of "data provider metadata", to avoid including lower-priority tasks (i.e. in the later column) in the same section as higher-priority tasks

11328 10/18/2013 09:47 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: datasource validations: regrouped by subtask instead of by datasource, so that the high-priority subtasks get done for all datasources before moving on to lower-priority subtasks for any datasources

11327 10/18/2013 08:54 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: reduced width of Milestone column to make room to fit an additional week on the printed page

11326 10/18/2013 08:42 AM Aaron Marcuse-Kubitza

planning/timeline/timeline.2013.xls: attribution/conditions of use: removed "(Brad/Brian/Bob/etc.)" because these are from everyone who provided or obtained data, not just Brad/Brian/Bob