Project

General

Profile

« Previous | Next » 

Revision 10229

planning/timeline/timeline.2013.xls: use bullet points (•) instead of background shading to indicate future tasks. this allows cells to easily be cleared by pressing Backspace, rather than having to copy a white-background cell on top of the cell.

View differences:

Also available in: Unified diff