planning/timeline/timeline.2013.xls: Reload existing data in need of refresh: added Oct because Rick Condit is supposed to provide us with a CTFS refresh that we would be allowed to use (he wouldn't let us use the 2011-4-1 full-DB export)
View differences: inline side by side
Also available in: Unified diff
planning/timeline/timeline.2013.xls: Reload existing data in need of refresh: added Oct because Rick Condit is supposed to provide us with a CTFS refresh that we would be allowed to use (he wouldn't let us use the 2011-4-1 full-DB export)