Project

General

Profile

« Previous | Next » 

Revision 10805

planning/timeline/timeline.2013.xls: added separate task for Individual datasource refresh (separate from Individual datasource removal), because we also need to optimize the reload of datasources. the reload is most likely slow because rows are being added to very large tables.

View differences:

Also available in: Unified diff