Project

General

Profile

« Previous | Next » 

Revision 9504

inputs/import.stats.xls: Postprocessing: populated entries for analytical DB for last 4 imports, and for backup, backup test for last import. note that the combined import time for the last import is 3.5 days, compared to 3 days for the column-based import portion.

  • added
  • modified
  • copied
  • renamed
  • deleted